Categories: News

Most difficult metro stretch in Bengaluru, built by Afcons, at Silk Board inaugurated

BENGALURU, India, May 1, 2026 /PRNewswire/ — Today, Hon’ble Dy Chief Minister D K Shivakumar along with MP Tejasvi Surya inaugurated the most difficult stretch which consisted of double-decker metro flyover at Silk Board junction, opened today, providing relief to lakhs of commuters. 

- Advertisement -

With flyovers D and E now opened for operational traffic, all five flyovers of the Central Silk Board double-decker flyover are operational. The flyover, South India’s first road-cum-rail structure, has brought long-awaited relief to thousands of commuters. Afcons Infrastructure Ltd. has constructed the five flyovers as part of its larger contract for elevated metro project along the Outer Ring Road and Central Silk Board junction.

- Advertisement -

“The Central Silk Board flyover stands as a testament to engineering excellence in the face of extraordinary complexity. Building a five-level structure amid Bengaluru’s second busiest junctions required precision, perseverance and innovation. With all flyovers set to be operational, we are proud to deliver not just infrastructure, but meaningful relief to lakhs of commuters every day,” said Krishnamurthy Subramanian, Executive Chairman, Afcons Infrastructure Ltd.

- Advertisement -

As part of the Blue Line, Afcons Infrastructure Limited is constructing the 9.8 km elevated section of Bengaluru Metro’s Silk Board–KR Puram (Phase 2A) project, which includes decongestion at Central Silk Board junction.

- Advertisement -

D. Murugadasan, Executive Vice-President (divisional head) at Afcons, said that due to heavy traffic at the junction for most of the day, space constraints with clusters of existing and ongoing flyovers and metro structures, works have to be planned and executed in a sequential manner, construction activity could be carried out only for five hours in a day, between 12 am and 5 am at mid night.

- Advertisement -

“All five flyovers are now operational, Commuters can save at least 30 minutes of travel time. Of the five flyovers, Flyover D is the tallest at 28 metres. It is at the fifth level, crossing the existing Hosur flyover, the Yellow Line metro and the double-decker flyover. Despite heavy traffic volumes and confined working space due to existing Rajakaluve on one side and 3 operational flyovers (Hosur flyover, Flyover A & Flyover C) and under construction CSB station (blue line) the team successfully completed all flyovers with precision,” said Ambareesh, Project Manager, Afcons.

- Advertisement -

The Central Silk Board junction is the city’s second-most congested traffic point after Hebbal and the construction of flyovers A, B, C, D & E together spanning 3.2 km has decongested the traffic at the junction. Three flyovers (A, B and C) were opened in mid-2024 to ease travel from Ragigudda and BTM towards HSR Layout and Electronic City by bypassing the Silk Board signal.

- Advertisement -

With the remaining two flyovers (D and E) now operational, commuters from HSR to BTM can bypass Silk Board entirely. The signal will henceforth mainly serve HSR–Madivala and Electronic City–HSR traffic, bringing major relief from congestion.

- Advertisement -

BOX

- Advertisement -

The flyover system includes:

- Advertisement -

Flyover A: Ragigudda Metro Station to Hosur Road
Flyover B: BTM Layout to Hosur Road and HSR Layout via Flyover A
Flyover C: Branch from Flyover A towards HSR Layout
Flyovers D & E: Newly opened, from HSR Layout to Ragigudda, with a down flyover for BTM Layout.

- Advertisement -

About Afcons Infrastructure Ltd

- Advertisement -

Afcons Infrastructure Ltd is flagship infrastructure engineering and construction company of the Shapoorji Pallonji Group. It has a legacy of over six decades, with strong track record of executing numerous technologically complex EPC projects both within India and internationally. As per the latest ENR survey, Afcons is ranked in Top 140 international Contractors globally; 12th in Bridges and 8th in Marine & Ports.

- Advertisement -

Photo: https://mma.prnewswire.com/media/2970896/Inauguration_double_decker_metro_flyover_Afcons.jpg
Photo: https://mma.prnewswire.com/media/2970895/D_E_Double_Decker_flyovers_Bengaluru_Afcons.jpg
Logo: https://mma.prnewswire.com/media/2581782/5746647/Afcons_and_SP_Logo.jpg

- Advertisement -

 

- Advertisement -

View original content to download multimedia:https://www.prnewswire.com/in/news-releases/most-difficult-metro-stretch-in-bengaluru-built-by-afcons-at-silk-board-inaugurated-302760160.html

- Advertisement -

Recent Posts

ZEISS announces successful early implantations of the AT LUCIA toric 721P intraocular lens

The new intraocular lens combines an aspheric bitoric optic with a patented non-constant aberration design…

25 minutes ago

Haleon Announces ~2000 Crore Total Investment to Set Up its First Manufacturing Facility in India

Greenfield facility in Madhya Pradesh to support 'Make in India' vision and strengthen Haleon's commitment…

25 minutes ago

Age is just a Number. Mobility is a Choice.

Robotics at Zydus Hospitals, Gujarat are revolutionising Joint Replacement Surgeries in the ElderlyAHMEDABAD, India, June…

25 minutes ago

LifeLabs Recognized Once Again by Forbes as One of Canadas Best Employers for 2026

Toronto, Ontario, June 11, 2026 (GLOBE NEWSWIRE) --  LifeLabs is proud to announce that we have…

1 hour ago

Priority Partners Receives Inaugural Impact of Excellence Award

HANOVER, Md., June 11, 2026 (GLOBE NEWSWIRE) -- Priority Partners, one of Maryland’s largest Medicaid…

1 hour ago

Human Continuum Closes Over $5 Million in Seed Round Funding to Support the Development of its Integrated Exosome-Based Therapeutic Longevity Platform

Jupiter, F.L., June 11, 2026 (GLOBE NEWSWIRE) -- Human Continuum Inc. (“HC” or “the Company”),…

1 hour ago